Quick Start GuideFieldPoint cFP-20xxWhat You Need to Get Set Up•cFP-20xx LabVIEW RT controller• Mounting hardware (DIN rail, panel-mount, or rack-mou
cFP-20xx Quick Start Guide 10 ni.com2. Install the cFP-20xx Controller on the Backplane1. Make sure that no power is connected to the controller.2. Ma
© National Instruments Corporation 11 cFP-20xx Quick Start Guide NATIONAL INSTRUMENTS
cFP-20xx Quick Start Guide 12 ni.com3. Install I/O Modules on the Backplane1. Align the captive screws on the I/O module with the holes on the backpla
© National Instruments Corporation 13 cFP-20xx Quick Start Guide4. Install Connector Blocks on the BackplaneIn order to connect I/O modules to input s
cFP-20xx Quick Start Guide 14 ni.com5. Connect the cFP-20xx to Your NetworkConnect the cFP-20xx controller to an Ethernet network using the RJ-45 Ethe
© National Instruments Corporation 15 cFP-20xx Quick Start Guide6. Wire Power to the Compact FieldPoint SystemEach cFP-20xx on your network requires a
cFP-20xx Quick Start Guide 16 ni.com7. Powering Up the cFP-20xxCheck the DIP switches on the controller, making sure that the RESET IP switch is not e
© National Instruments Corporation 17 cFP-20xx Quick Start Guide8. Install Software on the Host PC1. Install the software packages you plan to use, su
cFP-20xx Quick Start Guide 18 ni.comSpecificationsNetworkNetwork interface ... 10BaseT and 100BaseTX EthernetCompatibility .
© National Instruments Corporation 19 cFP-20xx Quick Start GuidePower RequirementPower supply range... 11 to 30 VDCRecommended
cFP-20xx Quick Start Guide 2 ni.com1. Mount the Compact FieldPoint BackplaneYou can mount the cFP-BP-x backplane on a 35 mm DIN rail, on a panel, or i
cFP-20xx Quick Start Guide 20 ni.comHumidity ... 10 to 90% RH, noncondensingMaximum altitude...
© National Instruments Corporation 21 cFP-20xx Quick Start GuideElectromagnetic CompatibilityThis product meets the requirements of the following EMC
cFP-20xx Quick Start Guide 22 ni.comCablingThe table below shows the standard Ethernet cable wiring connections for both normal and crossover cables.E
© National Instruments Corporation 23 cFP-20xx Quick Start GuideWhere to Go for SupportThe National Instruments Web site is your complete resource for
© 2002–2009 National Instruments Corporation. All rights reserved.373334D-01 Feb09National Instruments, NI, ni.com, and LabVIEW are trademarks of Nati
© National Instruments Corporation 3 cFP-20xx Quick Start GuideCablingClearance4 slots = 246 mm (9.68 in.)8 slots = 441 mm (17.4 in.)Cooling Outline51
cFP-20xx Quick Start Guide 4 ni.comMounting the Backplane on a Panel1. Fasten the panel-mount plates to the back of the cFP-BP-x using a number 2 Phil
© National Instruments Corporation 5 cFP-20xx Quick Start Guide104.78 mm (4.1 in.)63.50 mm (2.5 in.)22.23 mm (0.9 in.)33.15 mm(1.3 in.)129.54 mm(5.1 i
cFP-20xx Quick Start Guide 6 ni.com2. Bolt or screw the panel-mount accessory to a panel.3. Connect the PE ground terminal on the cFP-BP-x to safety g
© National Instruments Corporation 7 cFP-20xx Quick Start GuideCaution Do not use screws longer than 5/16 in. to fasten the DIN rail clip to the backp
cFP-20xx Quick Start Guide 8 ni.comMounting the Backplane in a Standard 19-in. Rack1. Fasten the rack-mount bracket to the back of the cFP-BP-x using
© National Instruments Corporation 9 cFP-20xx Quick Start Guide3. Connect the PE ground terminal on the cFP-BP-x to safety ground.Caution Disconnect p
Comentarios a estos manuales